2022 China New Design Track Chain Assembly - Excavator Track link Assy Komatsu PC200-5 20Y-32-00023 KM2451/49 – JiaLe
2022 China New Design Track Chain Assembly - Excavator Track link Assy Komatsu PC200-5 20Y-32-00023 KM2451/49 – JiaLe Detail:
Product Details
ITEM NAME: Komatsu Excavator PC200-5 20Y-32-00023 Track link KM2451/49
Part NO.: 20Y-32-00023
APPLICABLE MODEL: PC200
MATERIAL: 35MnB
ITEM | TRACK LINK |
MODEL | PC200-5 |
MATERIAL | 35MnB |
COLOR | BLACK OR YELLOW |
TRACK LINK TECHNIQUE | FORGING |
SURFACE HARDNESS | HRC48-58,DEPTH:8mm-12mm |
BRAND | JALE |
WARRANTY TIME | 12 MONTHS |
DELIVERY TIME | 15-30DAYS |
ITEM | TRACK LINK |
MODEL | 330 330L |
MATERIAL | 35MnB |
COLOR | BLACK OR YELLOW |
TRACK LINK TECHNIQUE | FORGING |
SURFACE HARDNESS | HRC48-58,DEPTH:8mm-12mm |
BRAND | JL |
WARRANTY TIME | 12 MONTHS |
DELIVERY TIME | 15-30DAYS |
Details Display
Features
Crack Resistance
Track bush is done with the carburization and the surface with induction hardening, which ensures the reasonable core hardness and abrasion resistance of internal and external surfaces.
Abrasion Resistance
Track pin is done with the tempering and the surface with induction hardening, which ensures the sufficient core hardness and abrasion resistance of external surfaces.
Deeper Hardened layer on the rail point
The track link has been done with the induction hardening treatment, which ensures its strength and abrasion resistance.
Induction hardening tread
The surface of chain link undergoes mid frequency hardening to ensure maximum strength and wear resistance.
Parameters
Structures
Product detail pictures:

Related Product Guide:
Our goal is to provide high quality products at competitive prices, and top-notch service to customers around the world. We are ISO9001, CE, and GS certified and strictly adhere to their quality specifications for 2022 China New Design Track Chain Assembly - Excavator Track link Assy Komatsu PC200-5 20Y-32-00023 KM2451/49 – JiaLe , The product will supply to all over the world, such as: India, Greece, Slovakia, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we are going to continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.

We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
