Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our excellent management, strong technical capability and strict quality control system, we continue to provide our clients with reliable quality, reasonable prices and excellent services. We aim at becoming one of your most reliable partners and earning your satisfaction for Hydraulic Heavy Equipment, Excavator Thumb Pins, 35mm Excavator Pin, Our tenet is evident all of the time: to deliver high quality solution at competitive price tag to clients throughout the planet. We welcome potential customers to get in touch with us for OEM and ODM orders.
Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe Detail:

Product Details

Product Name EX300-5 Excavator Spare Parts 7/8 X 65 MM Track Shoe Bolt Nut 9M7444
Part Number 9M74444 7G6442
Application Model Hitachi EX300-5 EX330 EX350
Material 40cr steel
Brand JALE or Customer Required
Size Body length: 65 mmBody Dia: M7/8Thread: 1.5 mm
Grade 12.9
Color Black or Customer Required
MOQ 100pcs
Quantity in box 100pcs
Warranty 12months
Payment Term T/T;L/C; Ail Trade Assurance; Western Union…
Delivery Time 15-20days(one container)
Stock Condition 10000 pcs in stock

Details Display

4
3
2
1

Parameters

KOMATSU

HITACHI

DOOSAN

HYUNDAI

CATERPILLAR

VOLVO

KOBELCO

SUMITOMO

JCB

PC30 EX300 DH55 R110 CAT70 EX140 SK120 SH120 JS130
PC60-6/7 EX120 DX80 R200 CAT312 EC210 SK200-8 SH200 JS200
PC200-3/5/6/7/8 ZX120-3 DH150 R210 CAT320 EC290 SK210 SH300 JS220
PC300-1/3/5 ZX200-3 DH225LC R250 CAT325 EC300 SK330-8 SH350 JS330
PC400-5 ZX240-3 DX260 E290 CAT330 EC360 SK460 SH450
PC800 ZX270-3 DX300 R305 CAT345 EC460
D20 ZX330-3 DH370 R450 D4D EC700
D60 ZX450 DX380 R520
D80 ZX870 DH500
D155 DX500LC

5

FAQ

Q: What about your products quality?
A: Win with reliability! We have 20 years of production experience and 10 years of export experience, quality is more better than some factories.
Q: What’s the delivery time?
A: Generally, for the standard orders, the delivery time is within 15 working days after receiving your advance payment.
Q: How long will our price be valid?
A: We are a friendly supplier, never greedy on windfall profit. Basically, our price remains stable through the year. We only adjust our price based on two situations: The rate of USD: RMB varies significantly according to the international currency exchange rates. Manufacturers adjusted the machine price, because of the increasing labor cost, and raw material cost.


Product detail pictures:

Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe detail pictures

Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe detail pictures

Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe detail pictures

Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe detail pictures


Related Product Guide:

We now have our own gross sales team, style and design workforce, technical crew, QC workforce and package group. We now have strict quality manage procedures for each system. Also, all of our workers are experienced in printing industry for Fast delivery Bolt And Sleeve Nut - Excavator Track Shoe Bolt Nut 9M7444 – JiaLe , The product will supply to all over the world, such as: Japan, Egypt, Malawi, We confirm to public, cooperation, win-win situation as our principle, adhere to the philosophy of make a living by quality, keep developing by honesty , sincerely hope to build up a good relationship with more and more customers and friends, to achieve a win-win situation and common prosperity.
  • Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
    5 Stars By Matthew Tobias from Philadelphia - 2018.12.22 12:52
    Wide range, good quality, reasonable prices and good service, advanced equipment, excellent talents and continuously strengthened technology forces,a nice business partner.
    5 Stars By Andy from Mecca - 2017.04.18 16:45
    Write your message here and send it to us